Skip to content
MSA MachineSafeAssess
Machine control panel with an emergency stop button, safety relays and wired terminal blocks

Product · Risk assessment

Run an ISO 12100 risk assessment in MSA

A structured hazard register replaces the spreadsheet, with every risk linked forward.

  • Residual risk per hazard
  • Safeguards linked to safety functions
  • Register exports to the technical file

How you do it in MSA

5 steps

  1. 1

    Create the project

    Name the machine, set the applicable standards and assign an owner.

  2. 2

    Define machine limits

    Record use, space, time limits and operating modes.

  3. 3

    Identify hazards

    Add hazards per zone and life-cycle phase, or import them.

  4. 4

    Score the risk

    Estimate severity, exposure, probability and avoidance for each hazard.

  5. 5

    Apply the 3-step method

    Record inherent design, safeguarding and information for use, then re-score.

Illustrative screen. Values are example data.

See it on your own machine

Bring a recent project. We’ll walk through it in MSA.