FAT / SAT

Prove the system works before it ships (FAT) and once it is installed (SAT) — with every safety function tested and signed off.

Factory and Site Acceptance Testing

Standard profileFAT / SAT
Category
Testing & validation
Scope
Industry practice
Edition / refs
IEC 62381 · IEC 61511 · project specifications

MSA output

  • Safety matrix (FAT/SAT)
  • Device test records & fault injection tests
  • NCR register
  • Test certificates & sign-off documentation
  • Document extraction engine

What is FAT / SAT?

A Factory Acceptance Test (FAT) verifies equipment or a control system at the supplier’s premises, before shipment, against the agreed specification. A Site Acceptance Test (SAT) repeats or completes that verification after installation, connected to real utilities, field devices and interfaces.

For safety-related systems, FAT and SAT are where safety functions are first proven end to end: each function is exercised, faults are injected and the response is recorded. IEC 62381 provides a framework for FAT, SAT and integration tests in process automation, and IEC 61511 treats FAT and SIS safety validation as defined life-cycle activities.

Who it applies to

  • System integrators delivering cells, lines and control systems
  • Machine builders and OEMs
  • Commissioning engineers
  • End users and their representatives witnessing tests

Key requirements

  1. 01

    Agreed test plan

    Test procedures agreed with the customer and referenced to the specification.

  2. 02

    Safety matrix

    Each safety function or cause-and-effect line mapped to test steps and expected results.

  3. 03

    Device and I/O checks

    Verify each device, its wiring, addressing and configuration.

  4. 04

    Fault injection

    Confirm the safe state on faults such as wire break, sensor discrepancy and loss of power or communication.

  5. 05

    Non-conformances

    Record, classify and close out every NCR before acceptance.

  6. 06

    Certificates and sign-off

    Issue test certificates and capture witness and customer signatures.

Summary for orientation only. Always refer to the current official text of FAT / SAT and any applicable legislation.

MSA for FAT / SAT

What MSA generates

Evidence produced from your engineering inputs, traceable end to end and exported to Word, PDF or Excel.

Safety matrix (FAT/SAT)

Generated from the safety functions defined upstream, so nothing is missed.

Device test records & fault injection tests

Per-device and per-fault procedures with recorded results.

NCR register

Non-conformances tracked from discovery to close-out.

Test certificates & sign-off documentation

Client-ready certificates and approvals, exported to Word, PDF or Excel.

Document extraction engine

Pulls data from existing engineering documents to build test packs.

Frequently asked questions

What is the difference between FAT and SAT?

FAT happens at the supplier’s facility before shipment, often with simulated I/O. SAT happens on site after installation, with real field devices, utilities and interfaces.

Is a FAT mandatory?

Usually it is a contractual requirement rather than a legal one. IEC 61511 expects the need for a FAT to be decided during design, while SIS safety validation on site is required before the hazards are introduced.

What is a safety matrix?

A table that maps each safety function — or each cause in a cause-and-effect chart — to its expected effects and the test steps that prove them, with results and signatures.

Generate FAT / SAT evidence from your own data

See how MSA turns your requirements, drawings and process data into certification-ready documents — fully offline.