Skip to content
MSA MachineSafeAssess
Machine control panel with an emergency stop button, safety relays and wired terminal blocks

For oems and machine builders

CE Technical Files that keep pace with your machine variants

Every variant, option and customer change needs its safety evidence updated. MSA links risk assessment, control system calculations and validation into one traceable model, so a design change updates the documents it affects.

Deliverables

  • Risk assessment (EN ISO 12100)
  • PLr / SIL calculations
  • Validation protocols
  • ATEX assessment
  • IQ/OQ/PQ validation protocols
  • Safety Matrix (FAT/SAT)
  • CE Technical File
  • Test certificates

The challenge

Why the safety package takes so long

Variants multiply documentation

Options and customer-specific changes each need an up-to-date risk assessment and Technical File.

The 2027 transition

Regulation (EU) 2023/1230 applies from 20 January 2027, with updated essential requirements and new rules on digital instructions.

Regulated customers ask for more

Pharmaceutical and food customers expect IQ/OQ protocols and FAT/SAT packs alongside the CE documentation.

With MSA

From engineering inputs to signed-off evidence

  1. 01

    Model

    Requirements, drawings and system models define the machine and its limits.

  2. 02

    Assess

    Risk assessment, PLr / SIL calculations, guard and access analysis and, where relevant, ATEX assessment.

  3. 03

    Validate

    Validation protocols, IQ/OQ/PQ protocols and FAT/SAT test packs generated from the same model.

  4. 04

    Release

    CE Technical File and client-ready exports. When the design changes, affected evidence regenerates.

Standards

Standards you’ll work with

How we work with you

Self-Service

You use MSA independently. Best for machine builders, oems, integrators, safety engineers.

Two ways to engage: Safety as SaaS for ongoing projects, or a One-time Safety Sign-off for a single machine or project.

  • Full MSA platform
  • Safety Intelligence Model
  • Generate certification-ready evidence
  • 100% offline deployment
  • Word, PDF, Excel — client-ready output

Frequently asked questions

Is MSA ready for the EU Machinery Regulation?

MSA is designed to be ready for Regulation (EU) 2023/1230, which applies from 20 January 2027.

Which formats can we export?

Word, PDF and Excel — client-ready output.

See MSA on your own project

Bring a recent machine or process package. We’ll show you how MSA turns the same engineering inputs into certification-ready evidence.